Full verification

According to the NFC 17102 standard, a complete verification includes visual inspections and the following measures to verify:

– the electrical continuity of the integrated conductors;
– the resistance values ​​of the ground connection (all variations
greater than 50% compared to the initial value should be analyzed);
– ​​the proper functioning of the PDA according to the methodology provided by the manufacturer.

Contact us

 

Add to quote

According to the NFC 17102 standard, a complete verification includes visual inspections and the following measures to verify:

– the electrical continuity of the integrated conductors;
– the resistance values ​​of the ground connection (all variations
greater than 50% compared to the initial value should be analyzed);
– ​​the proper functioning of the PDA according to the methodology provided by the manufacturer.

Learn more: Paraton@irESE lightning rod: a complete range of lightning protection

Learn more: Grounding: Optimal protection and electrical safety

Learn more: Lightning rod vs. surge arrester: what are the differences according to the IEC 62305:2024 standard?