According to the NFC 17102 standard, a complete verification includes visual inspections and the following measures to verify:
– the electrical continuity of the integrated conductors;
– the resistance values of the ground connection (all variations
greater than 50% compared to the initial value should be analyzed);
– the proper functioning of the PDA according to the methodology provided by the manufacturer.
According to the NFC 17102 standard, a complete verification includes visual inspections and the following measures to verify:
– the electrical continuity of the integrated conductors;
– the resistance values of the ground connection (all variations
greater than 50% compared to the initial value should be analyzed);
– the proper functioning of the PDA according to the methodology provided by the manufacturer.
Learn more: Paraton@irESE lightning rod: a complete range of lightning protection
Learn more: Grounding: Optimal protection and electrical safety