LPS France

French Quality, Worldwide Efficiency

Area protected to date by LPS France ® solutions throughout the world

The LPS France blog

What is the early flashover time of a lightning rod?

ESE: Operation and IEC 62305 standards

Operation of the ESD (early streamer emission) lightning rod, ΔT parameter, protection radius Rp and NF C 17-102 and IEC 62305 requirements. The advantages of the ESE lightning rod over the Franklin.

Read more »
Periodic verification of an early streamer emitter lightning rod — VGP inspection IEC 62305

VGP lightning rod mandatory — monitoring and traceability

The Periodic General Verification (PGV) of a lightning protection installation is an international regulatory requirement according to IEC 62305-3. Find out who is affected, what is verified, the required frequencies, and how LPS Manager ensures complete monitoring and traceability.

Read more »